516.812.6800
HQ: 270 Park Ave.
New Hyde Park, NY 11040
Macy’s Herald Square
We designed and built a custom power distribution system as part of a $400 million top-to-bottom remodel of the iconic Macy’s store.
Hurricane Sandy
We get key systems back online in 48 hours.
New York Downtown Hospital
We upgraded aging BAC towers with an innovative in-place installation that eliminated the need to dismantle the old system.
Viscardi Center Project
We did a turnkey energy-efficient lighting upgrade.
East Brunswick Water Authority
We replaced a wound rotor motor with a state of the art VFD drive and designed controls to fit into the existing cabinets.
Bethpage Library Project
We reduced cost by 33% on a major lighting upgrade.